Newsgroups: comp.sys.transputer
From: bl93r@ecs.soton.ac.uk (Benoit Lanaspre)
Subject: T9000 status
Organization: Electronics and Computer Science, University of Southampton
Date: 21 Jan 1994 21:42:18 -0000
Message-ID: <2hpi7q$38o@louis.ecs.soton.ac.uk>

I have just read in the editorial of the first issue of the journal of
the Transputer Consortium that the fabrication of the T9000 at Crolles
was due to start at the end of 1993.

Can anyone at INMOS tell what the current status is?

What is the frequency of the devices rolling out the fab. lines?
Design features ( 1.0, 0.7 micron canal length) ?

Thanks for the reply.
-- 
Benoit Lanaspre (bl93r@ecs.soton.ac.uk)
Declarative Systems Laboratory
University of Southampton, Southampton SO9 5NH
=============================================

